SAP ABAP Data Element I_DRUCKABL (Days between printout of meter reading orders and MR)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BF-PS (Application Component) Portioning and scheduling
     EE15 (Package) IS-U: Scheduling
Basic Data
Data Element I_DRUCKABL
Short Description Days between printout of meter reading orders and MR  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type INTERVALL    
Data Type DEC   Counter or amount field with comma and sign 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Print-MR 
Medium 15 Days print - MR 
Long 20 Days btw. print-MR 
Heading  
Documentation

Use

Determines the date of the meter reading order.

Dependencies

This number of days must be lower than the number of days between the order creation and the meter reading.

With SAP calendar => workdays
Without SAP calendar => calendar days

History
Last changed by/on SAP  20050224 
SAP Release Created in