Hierarchy
⤷ PT-SP-PS (Application Component) Shift Planning for Public Sector
⤷ PP08_PS_DE (Package) Shift Planning (Germany)
Basic Data
Data Element | HRDPBS_STD_BEW_DIENST |
Short Description | Adhoc: Standard Valuation for Shifts |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | HRDPBS_ANRECHN_3 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Val.Shifts |
Medium | 16 | Valuation Shifts |
Long | 22 | Std Valuation Shifts |
Heading | 6 | ValShf |
Documentation
Definition
In this field, you specify which valuation type should be used for shifts. You define this valuation for a specific information column in the shift group.
Shifts stand out because they do not have any of the markings attendance, absence or availability flagged in table T77ED. They are usually linked to a daily work schedule (this is not necessary though).
The valuation made here for shifts can be overwritten for a specific shift in IMG section Shift Abbreviations with Different Valuation .
Use
Dependencies
The evaluation made here is valid if no entry exists for the relevant abbreviation in table T7PBS_ADHOC_3 (shift abbreviations with different valuation).
Example
All shifts should receive the evaluation 'real hours if not off' for the info column 'Productive Hours'. For info columns 'Skeleton Time' and 'Total Time', the hours should always count (real hours).
The exception to this rule are night shifts, as the same valuations should apply but reduced by factor 75% for columns 'Skeleton Time' and 'Total Time', and reduced by 85% for 'Productive Hours'.
This can be mapped by the following table entries:
T7PBS_ADHOC_2
Shift gr Info column Evaluation shift
Intensive Productive hours Real hours, if not off (3)
Intensive Skeleton time Real hours (1)
Intensive Total time Real hours (1)
Table T7PBS_ADHOC_3
Shift grp Shift Adhoc update Entry Valuation Weighting
Intensive NA Productive hrs E/Z 3 85
Intensive NA All others E/Z 1 75
History
Last changed by/on | SAP | 20030108 |
SAP Release Created in | 600 |