Hierarchy
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VZ (Package) Application development R/3 RV central functions
Basic Data
Data Element | HORIZ_FP |
Short Description | Rule for determining the horizon in the billing/invoice plan |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | VDREG_VEDA | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table | TVRG |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Horizon |
Medium | 15 | Horizon |
Long | 20 | Horizon |
Heading | 4 | Hori |
Documentation
Procedure
Specify the date rule which the system is to use to determine the date which is currently the last planned billing date in the billing plan.
Use
The date rule is made up of a baseline date and a time period. The current date is always the baseline date for determining the horizon. The system adds on the time period to the baseline date to determine the horizon for the billing plan.
Example
Billing plan for a maintenance contract for a turbine
Date rule: One year
Baseline date: Today's date 06/30/96
Time period: + one year 06/30/97
The system calculates that the horizon for this billing plan is 30 June 1997.
Note
The horizon is not to be confused with the billing plan end date.
Supplementary Documentation - HORIZ_FP 0001
Procedure
Specifies the date rule to be used by the system to determine the last billing date in teh billing plan.
Use
The date rule is made up of a base date and a period. If you enter the base date, the system automatically adds the period for the base date, in order to determine the horizon for the billing plan.
Example
Billing plan for a maintenance contract for a turbine
Date rule: One year
Base date: Current date 06.30.96
Period: + one year 06.30.97
The system determines June 30 1997 as the last billing date for this billing plan.
Use
Procedure
Examples
Dependencies
Supplementary Documentation - HORIZ_FP 0002
Procedure
Specifies the date rule to be used by the system to determine the last invoicing date in the invoicing plan.
Use
The date rule is made up of a base date and a period. IF you enter the base date, the system automatically adds the period for the base date, in order to determine the horizon for the invoicing plan.
Example
Invoicing plan for a maintenance contract for a turbine
Date rule: One year
Base date: Current date 06.30.96
Period: + one year 06.30.97
The system determines June 30 1997 as the last invoicing date for this invoicing plan.
Use
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |