SAP ABAP Data Element GM_BDGT_APPROVAL (Budget Approval Indicator)
Hierarchy
EA-PS (Software Component) SAP Enterprise Extension Public Services
   PSM-GM-GTE-BU (Application Component) Budgeting and Availability Control
     GMBUDGETING_E (Package) Grants management (budgeting)
Basic Data
Data Element GM_BDGT_APPROVAL
Short Description Budget Approval Indicator  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name BDGT_APPROVAL   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Approval 
Medium 15 Budget Approval 
Long 20 Budget Approval 
Heading Approval 
Documentation

Definition

This indicator determines whether a budget document type in Grants Management needs to go through an approval process.

Use

This indicator is used in conjunction with the workflow processing of budgeting. If a budget document type has this indicator turned on, a budget document would need to be approved before the final posting. The document would be preposted and after the approval through workflow, it would be posted.

History
Last changed by/on SAP  20020219 
SAP Release Created in 110