SAP ABAP Data Element FXHPB (Planning time fence for independent requirements)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP-MP-DEM (Application Component) Demand Management
⤷ MDPB (Package) Application development R/3 purchasing
⤷ PP-MP-DEM (Application Component) Demand Management
⤷ MDPB (Package) Application development R/3 purchasing
Basic Data
Data Element | FXHPB |
Short Description | Planning time fence for independent requirements |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | FXHOR | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 8 | PlTmFnce |
Medium | 15 | Plng time fence |
Long | 20 | Planning time fence |
Heading | 4 | PTF |
Documentation
Definition
The planning time fence in demand management for planned independent requirements specifies a period in which you can maintain a message if changes are made to the demand program.
Hinweis
This particular planning time fence is only used in demand management for creating and changing planned independent requirements. It is not used in material requirements planning.
Supplementary Documentation - FXHPB 0001
Use
Procedure
The planning time fence is entered in days and is valid from the current date.
Enter an interval of between 1 and 999 days.
Examples
Dependencies
In order to control which type of message is issued when changes are made to the demand program, maintain the "fixing" indicator.
History
Last changed by/on | SAP | 19931130 |
SAP Release Created in |