SAP ABAP Data Element FAREG (Rule in billing plan/invoice plan)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
     VZ (Package) Application development R/3 RV central functions
Basic Data
Data Element FAREG
Short Description Rule in billing plan/invoice plan  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type FAREG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Bill.rule 
Medium 15 Billing rule 
Long 20 Billing rule 
Heading BR 
Documentation

Definition

Specifies for each billing plan date how the value to be billed is determined.

Example

  1. Billing plan for a rental contract for a piece of machinery
    • Billing dates: First of the month for 12 months
    • Billing amount: 1000 USD per month

Each date requires a billing rule which determines this fixed amount as the amount to be billed.

  1. Billing plan for the installation of a turbine at a customer location
    • Billing dates: Date delivered 10%
    • Date installed 30%
      Date turbine goes productive 70%
      Final invoice
    • Billing amount: 10,000 USD for entire project

Each date requires a billing rule which determines a percentage of the overall billing value of the project as the amount to be billed.

Note

In the second example, the billing values for each date could equally be fixed partial amounts rather than percentages. For example:

  • Billing dates: Date delivered 1,000 USD
  • Date installed 3,000 USD
    Date turbine goes productive 6,000 USD
    Billing amount 10,000 USD
Supplementary Documentation - FAREG 0001

Definition

specifies for each billing or invoicing plan date, how the amount is determined and whether the billing or invoicing plan date is relevant to calculation. Down payment dates are not calculation-relevant.

The system includes the billing rule or invoicing rule from the date category in the billing or invoicing plan as a default value.

The date category is assigned to the billing or invoicing plan type.

Further notes

Periodical billing is not supported in the billing or invoicing plan.

Supplementary Documentation - FAREG 0002

Definition

Specifies for each billing plan date, how the value to be billed is determined.

Example

  1. Billing plan for a rental contract for a device
    • Billing plan dates: First of the month for 12 months
    • Billing amount: 1000 USD per month

Every date requires a billing rule, which determines this fixed amount as the amount to be billed.

  1. Billing plan for installation of a turbine for a customer
    • Billing plan dates: Date for delivery 10%
    • Installations date 30%
      Date for start-up 70&
    • Billing amount: 10000 USD for the entire project

Each milestone requires a billing rule which determines a percentage of the entire billing value of the project as the amount to be billed.

Note

In the second example, the billing values for each date could also be fixed partial amounts rather than percentages, for example:

  • Billing plan dates: Date for delivery 1000 DM
  • Installations date 3000 DM
    Date for start-up 6000 DM
    Billing amount 10000 DM

Use

Procedure

Examples

Dependencies

Supplementary Documentation - FAREG 0003

Definition

Specifies for each invoicing plan date, how the value to be calculated is determined.

Example

  1. Invoicing plan for a rental contract for a device
    • Invoicing plan dates: First of the month for 12 months
    • Invoicing amount: 1000 USD per month

Every date requires a calculation rule, which determines this fixed amount as the amount to be calculated.

  1. Invoicing plan for installation of a turbine for a customer
    • Invoicing plan dates: Date for delivery 10%
    • Installations date 30%
      Date for start-up 70&
    • Invoicing amount: 10000 USD for the entire project

Each milestone requires a rule which determines a percentage of the entire value of the project as the amount to be calculated. Note

In the second example, the values for each date could also be

fixed partial amounts rather than percentages, for example:

  • Invoicing plan dates: Date for delivery 1000 USD
  • Installations date 3000 USD
    Date for start-up 6000 USD
    Billing amount 10000 USD

Procedure

Examples

Dependencies

History