SAP ABAP Data Element EWAHR (Usage Probability in % (Alternative Item))
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PRO (Application Component) Products
     CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element EWAHR
Short Description Usage Probability in % (Alternative Item)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DEC3    
Data Type DEC   Counter or amount field with comma and sign 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name USAGE_PROB   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Usage Prob 
Medium 15 Usg Probability 
Long 20 Usage Probability 
Heading UsagePr 
Documentation

Definition

Percentage probability that a material will be used in the assembly.

Use

The usage probability is always taken into account for requirements planning.

Procedure

Maintain selected usage probability
Requirements planning for alternative items is based on the usage probability.
Quantities are suggested based on the usage probability for the withdrawal posting according to strategy 1. You can plan in excess for the alternative items since the usage probability is not limited to 100%. You can change the proposed quantities. Maintain no usage probability If you do not enter a usage probability, the alternative item just serves as information that can be evaluated, for example, in a situation with a missing part.
You receive a warning since dependent requirements with 0 as quantity are created.

Examples

Withdrawal based on usage probability

Strategy: value 1

An alternative item group is maintained for each assembly. This alternative item group contains four materials with differing usage probabilities. Dependent requirements are passed on with 100 as quantity.

Material    Usage probability (%)        Requirement

M-1    70        70

M-2    20        20

M-3    20        20

M-4    0        no requirement

In this case, the materials are planned in excess since the sum of the usage probabilities is greater than 100%.

Dependencies

Supplementary Documentation - EWAHR 0001

Use

The usage probability serves as a tool for planning material requirements for BOM components or for advance planning of variant parts of a standard product.

History
Last changed by/on SAP  19991102 