SAP ABAP Data Element EVREL_ESTO (Schedule Line Reversal is Relevant to Rev.Distribution)
Hierarchy
IS-M (Software Component) SAP MEDIA
   IS-M (Application Component) SAP Media
     JAS (Package) Application development R/3 Publishing Advertising System***
Basic Data
Data Element EVREL_ESTO
Short Description Schedule Line Reversal is Relevant to Rev.Distribution  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 RDrelevant 
Medium 15 Rv.Distrb.Rel. 
Long 20 Rev.Distrib.Relev 
Heading Rv 
Documentation

Definition

This indicator stipulates that the cancelled schedule line is no longer to be used in revenue distribution. The cancellation reason is thus relevant to revenue distribution if you set this indicator.
This indicator is evaluated for cancellation reasons that are recorded at schedule line level.

Use

It is possible to use cancelled schedule lines in revenue distribution. If you use a cancellation reason for which this indicator is set when cancelling schedule lines, this schedule line will not be used during future revenue distribution that makes use of this schedule line.

Examples

  • You work with advance billing documents. You have created an order billing document for a billing dataset and have performed revenue distribution for this document. You want to cancel the billing dataset and its associated schedule lines before the service date. To do so, you should first cancel the order billing document followed by the billing dataset and associated schedule lines.
    You should use a cancellation reason for which the indicator has not been set to ensure that the system uses the same schedule lines for outstanding revenue distribution in the cancellation document as those used for the original order billing documents.
  • You want to cancel a schedule line before billing has been performed. If you do not wish this schedule line to be considered in future revenue distribution, you should use a cancellation reason for which the indicator is set.

History
Last changed by/on SAP  20050224 
SAP Release Created in