SAP ABAP Data Element DPLPU (Indicator: push distribution)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP-SOP-DRP (Application Component) Distribution Requirements Planning
⤷ MDRP (Package) Distribution Resource Planning
⤷ PP-SOP-DRP (Application Component) Distribution Requirements Planning
⤷ MDRP (Package) Distribution Resource Planning
Basic Data
Data Element | DPLPU |
Short Description | Indicator: push distribution |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DPLPU | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | DPLPU???? | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Push |
Medium | 17 | Push distribution |
Long | 20 | Push distribution |
Heading | 2 | PD |
Documentation
Definition
If there is excess inventory, surplus stock is retained at its place of origin or is distributed according to push logic.
Procedure
You have three options:
- If you leave the field blank, the system uses pull distribution; the demand of the current day is met through deployment, but excess stock is not distributed.
- If you select P, the system uses pull/push distribution; excess stock is distributed to meet the demand existing within the demand horizon according to the forecast in the DCs. Distribution begins on the first day for which requirements exist in the system and ends with the last day of the demand horizon.
- If you select X, all the requirements defined in the system are met through deployment. Distribution begins on the first day when requirements exist and continues until all the requirements defined in the system are met.
History
Last changed by/on | SAP | 19991108 |
SAP Release Created in |