SAP ABAP Data Element DABMG (Quantity Reduced (MRP))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ BBP_APPLICATION (Package) Structure Package EBP
⤷ ME (Package) Application development R/3 Purchasing
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ BBP_APPLICATION (Package) Structure Package EBP
⤷ ME (Package) Application development R/3 Purchasing
Basic Data
Data Element | DABMG |
Short Description | Quantity Reduced (MRP) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENGE | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 17 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | DISP_QUAN | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Qty Red. |
Medium | 15 | Qty Reduced |
Long | 20 | Qty Reduced (MRP) |
Heading | 17 | Quantity Reduced |
Documentation
Definition
Quantity already taken into account by materials planning and control.
Examples
If you have ordered 200 pc, MRP initially reckons with the quantity 200. As soon as an MRP-relevant confirmation arrives, the materials planning system takes the more up-to-date data as a basis. If, for example, an inbound delivery of 180 pc is posted, the "quantity reduced (MRP)" is 180. An open quantity of 20 pc remains.
History
Last changed by/on | SAP | 19980525 |
SAP Release Created in |