SAP ABAP Data Element CY_BUCKETB (Operations start or finish on point in period split)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CY01 (Package) R/3 Application Development: Resource Planning
Basic Data
Data Element CY_BUCKETB
Short Description Operations start or finish on point in period split  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KREUZ    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 AdhPerSplt 
Medium 15 Adhere per.splt 
Long 30 Always adhere to period split 
Heading 15 Adhere per.splt 
Documentation

Definition

Specifies when planning using a period split, depending on the planning direction either the start or finish dates of operations always lie on the points of the period split:

  • With planning direction forwards the operations start on points in the period split.
  • With planning direction backwards the operations finish on points in the period split.

Example

If you set the indicator and have specified planning direction forwards and a shift split then the operations always begin at the start of a shift.

Dependencies

This indicator is only effective if you have entered a period split.

History
Last changed by/on SAP  19980218 
SAP Release Created in