SAP ABAP Data Element CONFIRMATION_DATE (Completion Date of Call)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       IPRM (Package) Application Development R/3 Preventive Maintenance
Basic Data
Data Element CONFIRMATION_DATE
Short Description Completion Date of Call  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Compl.Date 
Medium 17 Completion Date 
Long 20 Completion date 
Heading 16 Completion date 
Documentation

Definition

Date for which a maintenance date was completed.

Use

When individual notifications or orders (IW22, IW32) are completed, the system proposes the planned date of the maintenance call object as the confirmation date. However, if the planned date is in the future, then this is replaced by the current system date.

During the completion of several notifications or orders using list processing (IW28, IW38), the system date is proposed as the confirmation date.

Dependencies

In some cases the completion date field is not ready for input, for example, if:

  • Subsequent calls already exist for the order or notification
  • The user has no authorization for confirmation
  • A maintenance call object cannot be confirmed again using list processing

Example

History
Last changed by/on SAP  20020506 
SAP Release Created in 470