SAP ABAP Data Element CO_PCOST (Determine Plan Costs: 1/2/3)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
Basic Data
Data Element | CO_PCOST |
Short Description | Determine Plan Costs: 1/2/3 |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CO_PCOST | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PLAN_COST_CALCULATION | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan Costs |
Medium | 15 | Plan Cost Calc. |
Long | 20 | Planned Cost Calcul. |
Heading | 20 | Planned Cost Calcul. |
Documentation
Definition
Determines whether planned costs are automatically calculated when you save the network.
The following options exist:
- 0: No planned costs are calculated when saving
- 1: Planned costs are calculated when saving, if the network has been released.
- Planned costs are only calculated if the network header has the status REL.
- 2: Planned costs are calculated when saving.
Dependencies
If you specify that no planned costs are calculated when you save, you can trigger planned costs calculation at any time from the order.
History
Last changed by/on | SAP | 19981110 |
SAP Release Created in |