Hierarchy
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element | CO_FLG_COM |
Short Description | Indicator to confirm available partial quantity |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Av.par.qty |
Medium | 15 | Av.partial qty. |
Long | 25 | Confirm av. partial qty |
Heading | 0 |
Documentation
Definition
Determines that all components are comitted with the same percentage rate during an availability check.
When you have set this indicator, if only a partial quantity can be committed for one component, then only partial quantities will be committed for all components during an availability check.
Example
Order quantity 100 PC:
Committed quantity
Requirement ATP quantity not set set
Component A 200 PC 300 PC 200 PC (100%) 80 PC (40%)
Component B 100 PC 40 PC 40 PC (40%) 40 PC (40%)
Component C 50 PC 200 PC 50 PC (100%) 20 PC (40%)
Since only 40% of component B can be committed, also only 40% of component A and C is committed when the indicator is set.
By setting the indicator, you can therefore ensure that orders are always only committed to the extent that they are also to be produced. In the example, 40% of the order can be produced for the requirements date. In addition, the quantities of component A and C that are not reserved can be assigned to other orders, which as a result may then also be produced.
History
Last changed by/on | SAP | 19960129 |
SAP Release Created in |