Hierarchy
⤷ CA-GTF-BS (Application Component) Business Application Support
⤷ CNV_21500_DDIC (Package) DDIC objects for 21500 package (for non-basis objects)
Basic Data
Data Element | CNV_21500_DUMMY_DYSCH |
Short Description | Create Daily Work Schedule Dynamically |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Dyn.DWS |
Medium | 15 | Dyn.daily WS |
Long | 25 | Dyn. daily work schedule |
Heading | 1 | D |
Documentation
Definition
If you activate this field, the system overwrites certain fields in the daily work schedule with values from the Planned Working Time infotype (0007) when the work schedule is accessed in time evaluation.
Use
Procedure
Examples
An employee works part-time - an average of 5 hours a day, a minimum of 4, and a maximum of 6. His/her work schedule rule is GL for flextime.
The monthly work schedule contains the daily work schedule GL from Monday through Friday. The daily work schedule GL starts at 08:00 and ends at 17:00 (8 planned hours plus breaks).
Dynamic generation of the daily work schedule:
If the employee's daily work schedule is accessed (e.g. to enter a full-day absence), the fields in the daily work schedule (GL) are overwritten as follows:
Field Old GL WS New GL WS
Start of normal working time 08.00 08.00
End of normal working time 17.00 13.00
Planned working time 08.00 05.00
Minimum working time 00.00 04.00
Maximum working time 00.00 06.00
The start of normal working time is identical to the data in the daily work schedule. However, the end of normal working time is calculated by adding the number of daily working hours to the start of normal working time. The system performs this operation if you activate the Dynamic daily work schedule field.
The minimum working time is taken from the Minimum working time per day field and the
maximum working time from the Maximum working time per day field.
If the employee's break schedule specifies a break between 08:00 and 13:00, the new working time end is extended accordingly.
Dependencies
History
Last changed by/on | SAP | 20141029 |
SAP Release Created in | 2010_1_620 |