SAP ABAP Data Element CNV_21500_DUMMY_DYSCH (Create Daily Work Schedule Dynamically)
Hierarchy
DMIS (Software Component) DMIS 2011_1
   CA-GTF-BS (Application Component) Business Application Support
     CNV_21500_DDIC (Package) DDIC objects for 21500 package (for non-basis objects)
Basic Data
Data Element CNV_21500_DUMMY_DYSCH
Short Description Create Daily Work Schedule Dynamically  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Dyn.DWS 
Medium 15 Dyn.daily WS 
Long 25 Dyn. daily work schedule 
Heading
Documentation

Definition

If you activate this field, the system overwrites certain fields in the daily work schedule with values from the Planned Working Time infotype (0007) when the work schedule is accessed in time evaluation.

Use

Procedure

Examples

An employee works part-time - an average of 5 hours a day, a minimum of 4, and a maximum of 6. His/her work schedule rule is GL for flextime.

The monthly work schedule contains the daily work schedule GL from Monday through Friday. The daily work schedule GL starts at 08:00 and ends at 17:00 (8 planned hours plus breaks).

Dynamic generation of the daily work schedule:
If the employee's daily work schedule is accessed (e.g. to enter a full-day absence), the fields in the daily work schedule (GL) are overwritten as follows:

Field Old GL WS New GL WS
Start of normal working time 08.00 08.00
End of normal working time 17.00 13.00
Planned working time 08.00 05.00
Minimum working time 00.00 04.00
Maximum working time 00.00 06.00

The start of normal working time is identical to the data in the daily work schedule. However, the end of normal working time is calculated by adding the number of daily working hours to the start of normal working time. The system performs this operation if you activate the Dynamic daily work schedule field.

The minimum working time is taken from the Minimum working time per day field and the

maximum working time from the Maximum working time per day field.
If the employee's break schedule specifies a break between 08:00 and 13:00, the new working time end is extended accordingly.

Dependencies


History
Last changed by/on SAP  20141029 
SAP Release Created in 2010_1_620