SAP ABAP Data Element CN_FLG_PRE (In general generate preliminary requirements)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
Basic Data
Data Element | CN_FLG_PRE |
Short Description | In general generate preliminary requirements |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Prel.rqmts |
Medium | 15 | Prelim. reqmts |
Long | 20 | Preliminary reqmts |
Heading | 5 | PreRq |
Documentation
Definition
Determines that in general preliminary requirements are generated in the form of planned independent requirements and preliminary purchase requisitions.
You can only generate real requirements in the form of reservations and purchase requisitions for components whose higher-level assembly has been entered as an assembly item.
Similarly components that do not have a material number cannot be procured in advance. This type of component can only be procured directly.
Dependencies
If you do not select this indicator and you have selected the indictor Multi-level for BOM-explosion then there is a risk that requirements are generated by both the network and material requirements planning - producing excess requirements.
History
Last changed by/on | SAP | 19990326 |
SAP Release Created in |