SAP ABAP Data Element CMP_BUIND (Message type for exceeding budget)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷ PA-CM (Application Component) Compensation Management
⤷ PCMP (Package) Compensation management
⤷ PA-CM (Application Component) Compensation Management
⤷ PCMP (Package) Compensation management
Basic Data
Data Element | CMP_BUIND |
Short Description | Message type for exceeding budget |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CMP_MSGTY | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Mess.type |
Medium | 15 | Message type |
Long | 20 | Message type |
Heading | 8 | M |
Documentation
Definition
Determines what type of message the system displays if the compensation adjustment goes over budget.
Possible message types are:
- I = Information
- W = Warning
- E = Error
Use
Enter an I in this field, if you just want to inform the user that budget has been exceeded.
Enter a W in this field, if you want to warn the user that the budget has been exceeded.
Enter an E in this field, if the user is not allowed to go over budget.
Leave this field empty, if you do not want the system to display a message when the budget is exceeded.
History
Last changed by/on | SAP | 20030120 |
SAP Release Created in |