Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element | CK_SELKZ |
Short Description | Indicator for Relevancy to Costing |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CK_SELKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table | TCK08 |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | COST_RELEVANT | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CostRel |
Medium | 15 | CostingRelevncy |
Long | 31 | Relevancy to Costing Indicator |
Heading | 31 | Relevancy to Costing Indicator |
Documentation
Definition
Controls the extent to which a BOM item, operation, or suboperation in the routing is included in costing.
Use
For the Standard Cost Estimate and the calculation of planned costs for a Work Order, this indicator determines whether the item is included in the costing or not.
Examples
- A BOM item or operation for which the indicator for relevancy to costing is X is fully relevant to costing.
- A BOM item or operation without an indicator for relevancy to costing is not relevant to costing at all.
Use
For Inventory Costing, you can link relevancy to costing indicators to factors for the fixed and variable costs so that the item values can be adjusted in costing depending on the valuation variant. You do this in Customizing for Product Cost Controlling.
Examples
A BOM item or operation has the indicator for relevancy to costing A which you have linked in Customizing for Product Cost Controlling to a fixed factor of 0.8 and a variable factor of 0.8. The BOM item or operation will be costed in inventory costing at 80% of the fixed costs and 80% of the variable costs.
Dependencies
For 'output materials' (that is, materials for which the co-product indicator has been set in the material master and which have a negative BOM item), the relevance to costing indicator has no effect on the BOM item.
As regards the BOM usage which you selected in the initial screen, it depends whether this field is ready for input. For more information, see Customizing under Production -> Basic Data -> Bill of Material -> General Data -> BOM Usage -> Define BOM Usages.
Supplementary Documentation - CK_SELKZ 0010
Use
You use this indicator to specify that the system only displays BOM items for which the 'relevancy to costing' indicator is also set in the BOM (screen Item data: Status / Long text).
Procedure
Examples
Dependencies
Supplementary Documentation - CK_SELKZ 0050
Use
Procedure
Examples
Dependencies
As a differentiating characteristic for the item status, it controls:
- the processing flow in the subsequent work areas
- the selection of the items in the BOM explosion
The indicator never interrupts the complete explosion down to the lowest level. The explosion process takes place in two steps: - In the first step, the system explodes the complete BOM - regardless of how the selection indicators are selected. The result of the explosion is not displayed on the screen.
- In the second step, the system evaluates the selection indicators, such as the indicator for relevancy to costing.
This status indicator works as a filter. On the screen you only see the items that meet the selection criteria. In this case, only items for which the relevancy to costing indicator is selected are displayed.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in |