SAP ABAP Data Element CK_PERTARI (Scheduled Activity Price Calculation)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ1 (Package) Customizing for Product Costing
⤷ CO-PC-PCP (Application Component) Product Cost Planning
⤷ CKJ1 (Package) Customizing for Product Costing
Basic Data
Data Element | CK_PERTARI |
Short Description | Scheduled Activity Price Calculation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 5 | Sched |
Medium | 17 | SchedActivPricCal |
Long | 32 | Scheduled Activity Price Calcln. |
Heading | 32 | Scheduled Activity Price Calcln. |
Documentation
Definition
Internally-processed activities in networks and production orders are supported by period-specific costing.
Use
Set this indicator to activate period-specific costing.
The system distributes the planned work in the network activity according to the distribution key of the capacity requirements and valuates it with the activity price of the period concerned. If no plan activity price is maintained in future periods, a planned activty input is valuated with the most current activity price found. This is controlled using the strategy for valuating the internal activities.
Procedure
Examples
Dependencies
- In order to distribute the planned work to the individual periods, a distribution key must have been stored in the activity or in the work center. The distribution key in the activity has priority. If no distribution key is maintained for the planned work, the latter is distributed equally over all periods.
- For general costs activities in networks, a distribution key distributes the planned costs to the individual periods.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |