SAP ABAP Data Element CK_DERZK (Procedure When Creating Material Cost Estimate)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element | CK_DERZK |
Short Description | Procedure When Creating Material Cost Estimate |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CK_DERZK | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | MatCEstPrc |
Medium | 20 | MatCostEst Procedure |
Long | 30 | Mat. Cost Estimate Procedure |
Heading | 2 | CE |
Documentation
Definition
Controls whether a material with this material status is costed. The material status also controls whether the system issues a warning or an error message in the case of faulty costing when the material is used in further cost estimates.
Example
- Material is to be costed
When the material is successfully costed, its cost estimate receives the status KA (costed without errors).
If the material was costed with errors and its cost estimate is used in a cost estimate for a higher-level material, you can control whether the system: - issues a warning message
In this case, the cost estimate for the higher-level material can receive the status KA (costed without errors). - issues an error message
In this case the cost estimate for the higher-level material receives the status KF (costed with errors). - Material is not to be costed
If a material is not costed, its standard price remains unchanged.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |