Basic Data
Data Element | BP_V_N_CHG |
Short Description | Do not change existing target data |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | X | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Do not chg |
Medium | 15 | Do not change |
Long | 20 | Do not change |
Heading | 20 | Do not change |
Supplementary Documentation - BP_V_N_CHG0001
Definition
Indicator, which controls how existing data in the target version is treated.
You have the option of keeping existing planning data in the target version, or of overwriting it.
- keeping the data
The system checks, whether the project in the target version already contains planning data for the relevant degree of detail. If it does, the data is not overwritten.
Example 1:
If version 000 contains rough plan values for 1995 and 1996 and version 001 contains structure plan values for 1995, only the new data - that is, the values for 1996 - is copied.Example 2
There are two plan versions with the following cost element plan values:
Version 000
Cost element 400000/1995: $1000 and 415000/1995: $1500
Version 001:
Cost element 400000/1995: $2000
The system copies the plan value for cost element 415000 to version 001.If planning data ever existed in the target version, but you have reset the value to zero, the database still has a planning data record for this project, with value 0. The system recognizes this data record and does not overwrite it.
- resetting and overwriting
The system resets all the data in the target version for the relevant planning activity and overwrites it with the planning data from the reference version.
Supplementary Documentation - BP_V_N_CHG0002
Definition
Indicator, which controls how existing data in the target version is treated.
Use
You have the option of keeping existing budget data in the target version, or of overwriting it.
- keeping the data
The system checks, whether the project in the target version already contains budget data for the relevant budget activity. If it does, the data is not overwritten.
If budget data ever existed in the target version, but you have reset the value to zero, the database still has a budget data record for this project, with value 0. The system recognizes this data record and does not overwrite it.
- resetting and overwriting
The system resets all the data in the target version for the relevant budget activity and overwrites it with the budget data from the reference version.
- adding
The system adds the data from the selected budget activities in the reference version to the data in the target version.
History
Last changed by/on | SAP | 20010720 |
SAP Release Created in |