Hierarchy
⤷ CA-GTF-BS (Application Component) Business Application Support
⤷ KABP (Package) Cost Accounting budget and planning
Basic Data
Data Element | BP_V_ADD |
Short Description | Add reference data to target data |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | X | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Add |
Medium | 15 | Add |
Long | 20 | Total up |
Heading | 20 | Total up |
Supplementary Documentation - BP_V_ADD 0002
Definition
Indicator, which controls how existing data in the target version is to be treated.
Use
You have the option of keeping existing budget data in the target version, or of overwriting it.
- keeping the data
The system checks, whether the project in the target version already contains budget data for the relevant budget activity. If it does, the data is not overwritten.
If budget data ever existed in the target version, but you have reset the value to zero, the data base still has a budget data record for thisproject, with value 0. The system recognizes this data record and does not overwrite it.
- resetting and overwriting
The system resets all the data in the target version for the relevant budget activity and overwrites it with the budget data from the reference version.
- adding
The system adds the data from the selected budget activities in the reference version to the data in the target version.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 20010720 |
SAP Release Created in |