SAP ABAP Data Element BP_STORNO (Reverse Budget Carryforward)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CA-GTF-BS (Application Component) Business Application Support
     KABP (Package) Cost Accounting budget and planning
Basic Data
Data Element BP_STORNO
Short Description Reverse Budget Carryforward  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Reversal 
Medium 15 Reverse 
Long 30 Reverse Budget Carryforward 
Heading 10 Reverse 
Documentation

Definition

If you activate this indicator, the budget of the expired fiscal year already carried over is reversed. This means that the budget of the specified projects carried over into the following fiscal year is transferred back to the sender fiscal year.

The reversal can be reconstructed through the line items.

The budget carryover can be carried out again.

A reversal is not possible if a budget carryover has already been carried out for the following year.

History
Last changed by/on SAP  20020124 
SAP Release Created in 470