SAP ABAP Data Element BERKZ (Material Staging Indicator for Production Supply)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       LVS (Package) Application development Warehouse Management (WM)
Basic Data
Data Element BERKZ
Short Description Material Staging Indicator for Production Supply  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type LVS_BERKZ    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Stg.Ind. 
Medium 15 Staging Ind. 
Long 20 Mat.Staging Indicat. 
Heading
Documentation

Definition

The material staging indicator defines the method of how needed materials can be supplied for production with the assistance of the Warehouse Management system.

As with the location coordinates (warehouse number, storage type,and storage bin), the system files this indicator in the control cycle.

The following material staging methods are supported:

  • '1': Pick parts

    These materials are picked according to the required quantity specified in the production order.

  • '2': Crate or kanban parts

    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.

  • '3': Release order parts

    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.

  • '4': Manual staging

    Materials are staged manually. For example, you can transport individual components using manually created transfer orders, or you can use the bypass method to transport them directly from the goods receipt zone to production. When you post the goods issue, postings are made to the production storage bins from the control cycles.

  • '0': Not relevant to WM-PP

    These materials are not relevant for WM production supply and cannot be requested using the WM system.

History
Last changed by/on SAP  19991102 
SAP Release Created in