Hierarchy
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element | BEIKZ |
Short Description | Material Provision Indicators |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BEIKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table | T417 |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | MATPROVIND | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | MatProvInd |
Medium | 15 | Mat. Prov. Ind. |
Long | 20 | Mat. Provision Ind. |
Heading | 7 | MP Ind. |
Documentation
Definition
This key indicates that the item is subject to material provision.
Use
In the BOM explosion, you can use this indicator to restrict the items selected.
There are two types of material provision:
- Material provided by a vendor
- Material provided by a customer
Dependencies
- Material provided by a vendor
This indicator controls material requirements planning. Maintain this indicator for BOM components only if the material master record of the header material supports subcontracting (Special procurement field).
The special procurement key for subcontracting means that all components of the BOM are provided free of charge to a subcontractor for further processing. The items are copied to a subcontract order.
- If the item is provided to a vendor, do not enter any material provision indicator.
Dependent requirements are generated for this item. - If the item is already at a vendor's premises and is not provided by us, do enter an indicator.
No dependent requirements are generated for this item.
- Material provided by a customer
This indicator is not currently active.
Supplementary Documentation - BEIKZ 0002
Procedure
You can only choose indicators which were entered in Customizing (BOMs).
Dependencies
Entry of this indicator is independent of the BOM usage.
Supplementary Documentation - BEIKZ 0003
Procedure
Set the Material to be provided indicator according to which the system is to select.
Supplementary Documentation - BEIKZ 0020
Use
Procedure
Examples
Dependencies
In the BOM explosion, you can use this indicator to restrict the items selected.
This indicator does not interrupt the complete explosion down to the lowest level of the BOM. There are two steps to the explosion:
- First, the BOM explodes the entire BOM - regardless of the indicators selected to restrict the items. You do not see the result of this explosion on the screen.
- Second, the system reads the indicators for restricting which items are selected, such as the material provision indicator.
These indicators work as filters. The explosion result you see on the screen only includes the items that fulfil your selection criteria. In this case, only the items that have the material provision indicator you selected are displayed.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |