Hierarchy
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VZ (Package) Application development R/3 RV central functions
Basic Data
Data Element | BEDAT_FP |
Short Description | Start date for billing plan/invoice plan |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start date |
Medium | 15 | Start Date |
Long | 20 | Start Date |
Heading | 10 | Start date |
Supplementary Documentation - BEDAT_FP 0001
Use
When creating an invoicing plan, the start date taken is the earliest start date for the transaction or material components.
You can overwrite the start date. When copying dates fron the system invoicing plan, the start date is the reference date.
Example
In the standard invoicing plan, the following dates are maintained:
Start date: 01.01.98
Invoicing date: 15.01.98
The start date in the invoicing plan is the 01.03.99. The system calculates the dates of the standard billing plan with reference to the start date. The system determines 15.03.99 as the invoice date.
Supplementary Documentation - BEDAT_FP 0002
Use
When creating the billing or invoicing plan, the following dates are taken as start dates:
- PSP Element: Today's date
- Cost processing operation or external processing operation: the earliest finish date for the operation
- Material components: requirements date
When transferring deadlines from the standard billing or invoice plan, the start date is the reference date.
Example
The following deadlines are maintained in the billing and invoice plan in the standard system:
Start date: 01.01.98
Billing or invoice date: 15.01.98
The start date in the billing or invoice plan is 01.03.99. THe system calculates the deadlines for the billing or invoice plan with reference to the start date. The system determines the 15.03.99 as a billing or invoicing deadline.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |