Hierarchy
⤷ IS-U-CS-CRM (Application Component) Integration: Customer Relationship Management
⤷ EEPDSC1 (Package) IS-U: Master Data Generator
Basic Data
Data Element | BBP_FORCE |
Short Description | Create Budget Billing Plan in Subsequent Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KENNZX | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | BBP SP |
Medium | 15 | BBP Subs.Period |
Long | 20 | BBP Subs. Period |
Heading | 2 | WF |
Documentation
Definition
If you select this field, the system creates the budget billing plan in the subsequent period (if necessary).
When you create a budget billing plan, the system distributes the budget billing amounts over the given number of due dates. The system only uses due dates that fall before the next periodic meter reading.
If, for example, you create a budget billing plan in the context of a move-in then there may be no due dates before the next periodic meter reading. If this is the case, and you are working in dialog mode, the system generates a message and you can create the budget billing plan in the next period.
However, if you are using the master data generator you cannot work in dialog mode. For this reason you must use this field to decide when the budget billing plan is to be created.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 463 |