SAP ABAP Data Element BBP_FORCE (Create Budget Billing Plan in Subsequent Period)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-CS-CRM (Application Component) Integration: Customer Relationship Management
     EEPDSC1 (Package) IS-U: Master Data Generator
Basic Data
Data Element BBP_FORCE
Short Description Create Budget Billing Plan in Subsequent Period  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KENNZX    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 BBP SP 
Medium 15 BBP Subs.Period 
Long 20 BBP Subs. Period 
Heading WF 
Documentation

Definition

If you select this field, the system creates the budget billing plan in the subsequent period (if necessary).

When you create a budget billing plan, the system distributes the budget billing amounts over the given number of due dates. The system only uses due dates that fall before the next periodic meter reading.

If, for example, you create a budget billing plan in the context of a move-in then there may be no due dates before the next periodic meter reading. If this is the case, and you are working in dialog mode, the system generates a message and you can create the budget billing plan in the next period.

However, if you are using the master data generator you cannot work in dialog mode. For this reason you must use this field to decide when the budget billing plan is to be created.

History
Last changed by/on SAP  20050224 
SAP Release Created in 463