SAP ABAP Data Element BAGUE (Base date for planning delivery schedule generation)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
     VA (Package) Application development R/3 Sales
Basic Data
Data Element BAGUE
Short Description Base date for planning delivery schedule generation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type BAGUE    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 BaselineDt 
Medium 15 GenBaselineDate 
Long 20 PlanningGenBaseDate 
Heading
Documentation

Definition

Specifies the date taken by the system as the initial date of the planning delivery schedule generation.

Use

The system uses the date you enter here as the start date for the delivery schedule split validity period and splitting rule range. These determine which schedule lines are included in or excluded from the planning delivery schedule.

Procedure

If you do not enter a value here, the system will not generate schedule lines in the planning delivery schedule!

  • Enter 1 to set the delivery schedule date in the forecast delivery schedule as the base date.

    In this way, the planning delivery schedule results are not dependent on the day on which the delivery schedule is actually generated.

    If there is no forecast delivery schedule for the item, the system uses the date of the previous planning delivery schedule as the base date.

  • Enter 2 to set the date of planning delivery schedule generation as the base date.

    Use this date to push back the split validity period and splitting rule range. Note that the base date does not affect the beginning date of the split, which is still the forecast delivery schedule date.

No matter what date you decide to use as the base date, schedule lines in the forecast delivery schedule whose dates lie before the planning delivery schedule creation date are included. Schedule lines from the forecast delivery date up to the base date will be split in the same way as those schedule lines whose dates lie on or after the base date.

History
Last changed by/on SAP  19970812 