SAP ABAP Data Element AWESP (Calculate Cost Split)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-OBJ-PER (Application Component) Product Cost by Period
⤷ KKS (Package) Cost Object Controlling: Repetitive Manufacturing
⤷ CO-PC-OBJ-PER (Application Component) Product Cost by Period
⤷ KKS (Package) Cost Object Controlling: Repetitive Manufacturing
Basic Data
Data Element | AWESP |
Short Description | Calculate Cost Split |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | AWEPS | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Splitting |
Medium | 15 | Splitting |
Long | 20 | Splitting |
Heading | 0 |
Documentation
Definition
This indicator means that actual costs can be split according to target costs.
Use
- In cost object controlling, actual costs that cannot be allocated to a product are allocated to a cost object hierarchy. These actual costs are distributed to the products on the basis of the target costs for each product. Variances are calculated for each product.
- In cost center accounting, the activity-independent actual costs are apportioned to the activity types according to the target costs for each activity type. If the system cannot calculate the target costs, apportionment is via equivalence numbers (such as, capacities, statistical bases, equivalnce numbers, units of activity). These values form the basis of variance calculation.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19950401 |
SAP Release Created in | 470 |