SAP ABAP Data Element ANZMS (Number of employees)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-PS (Application Component) Cross-Application Objects in Project System
⤷ BC (Package) Cross-Application Objects PP/PS
⤷ CA-GTF-PS (Application Component) Cross-Application Objects in Project System
⤷ BC (Package) Cross-Application Objects PP/PS
Basic Data
Data Element | ANZMS |
Short Description | Number of employees |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ANZMA | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 5 | |
Decimal Places | 2 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | NO_OF_EMPLOYEE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | No of empl |
Medium | 15 | No. employees |
Long | 20 | Number of employees |
Heading | 6 | NoEmpl |
Documentation
Definition
Number of employees needed to carry out the operation.
Supplementary Documentation - ANZMS 4420
Definition
Number of employees that are required for the execution of a phase .
Use
You enter the number of employees for phases that are assigned a primary resource with a labor capacity. It is evaluated later as follows:
- In the planning table for repetitive manufacturing, the maximum and minimum number of employees required a planning period is determined.
- You can transfer the required number of employees to external planning tools via the POI interface.
The number of employees that you enter in operations is only for information. The system does not compare the number of employees required for an operation and the number required in the subordinate phases.
Supplementary Documentation - ANZMS 4500
Definition
Number of employees that are required for the execution of a secondary resource .
Use
You enter the number of employees for phases that are assigned a secondary resource with a labor capacity. It is evaluated later as follows:
- In the planning table for repetitive manufacturing, the maximum and minimum number of employees required a planning period is determined.
- You can also transfer the required number of employees to the Process Flow Scheduler or other external planning tools via the POI interface.
History
Last changed by/on | SAP | 19990629 |
SAP Release Created in |