Hierarchy
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element | ALTVO |
Short Description | Indicator: alternative priority |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | AltPriorty |
Medium | 15 | Alt priority |
Long | 20 | Alternative priority |
Heading | 3 | APr |
Documentation
Definition
Indicator: when a multiple BOM is exploded, the BOM found is determined by the alternative you enter.
Use
Components of multiple BOMs that have their own BOM are only exploded if the alternative you entered exists.
Supplementary Documentation - ALTVO 0001
Procedure
Set this indicator if you have entered a specific alternative which you want the system to search for.
Examples
An existing multi-level multiple BOM has a number of alternatives:
- If you enter 03 in field "Alternative" and enter X in field "Alternative priority", the system explodes alternative 03 of the three-level multiple BOM in full.
------------------------ Level
| BOM A |
| ALT 01; ALT 02; ALT 03 | 1
------------------------
| |
------------------------ ----------------
| BOM B | | BOM C |
| ALT 01; ALT 02; ALT 03 | | ALT 01; Alt 02 | 2
------------------------ --------------
| |
---------------- -------
| BOM D | | BOM E |
| ALT 01; ALT 03 | | ALT 01 | 3
---------------- --------
- If you enter 02 in field "Alternative" and enter X in field "Alternative priority", the system only explodes the multiple BOM down to levels 1 and 2, as only these levels exist for the requested alternative 02.
As other alternatives exist, the system sets an indicator on the second level.
History
Last changed by/on | SAP | 19930713 |
SAP Release Created in |