Hierarchy
⤷ PT-SP-PS (Application Component) Shift Planning for Public Sector
⤷ PP08_PS (Package) Workforce Planning PS
IMG Activity
ID | SIMG_PBS_PTSP_060 | Set Up Enhanced Cumulation of Requirements |
Transaction Code | S_AC0_52000505 | (empty) |
Created on | 20050216 | |
Customizing Attributes | SIMG_PBS_PTSP_060 | Set Up Enhanced Cumulation of Requirements |
Customizing Activity | SIMG_PBS_PTSP_060 | Set Up Enhanced Cumulation of Requirements |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_PBS_PTSP_060 |
Use
In this IMG activity, you can set up the enhanced cumulated display of requirements records. This improves the readability of the requirements matchup in the shift plan overview.
Once you have activated the enhancement, you can use the simple cumulation of requirements function to specify which requirements records are summarized in one row. You assign a common group abbreviation to these requirements records.
The system first checks whether a group abbreviation is assigned to a requirement and, if so, displays the corresponding requirements records summarized under the group abbreviation in one line. The system treats any requirements to which no group abbreviation is assigned according to the criteria for the simple cumulation of requirements, and displays them cumulated or not, as appropriate.
In the cumulated requirements row of the requirements matchup, the group abbreviation is displayed instead of the shift abbreviation. Unlike in the simple cumulation of requirements, the system does not display the start and end times, since they may be different within one group.
Requirements
You have activated the enhanced cumulation of requirements function using the PEINS PSDBV switch. For more information, see Activate Cumulation of Requirements.
Standard settings
In the standard system, the enhanced cumulation of requirements function is not activated.
Activities
- Select a shift group line, and choose Group ID in the dialog structure.
- In the Group ID field, enter the same two-character abbreviation for the shifts that you want to group, for example, EX for all early shifts.
- Choose Save.
Example
Business Attributes
ASAP Roadmap ID | 262 | Technical and Graphical Settings |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_PBS_PTSP_060 | 0 | L6B0000011 | Shift Planning for Public Sector |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
VC_T77ED_GROUP | C - View cluster | OOT5 |
History
Last changed by/on | SAP | 20050222 |
SAP Release Created in | 600 |