Hierarchy
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KK0C (Package) Customizing for Cost Object Controlling
IMG Activity
ID | SIMG_ORKK_WERK_KA02 | Define Cost Elements for WIP Calculation |
Transaction Code | S_ALR_87008058 | IMG Activity: SIMG_ORKK_WERK_KA02 |
Created on | 19981222 | |
Customizing Attributes | SIMG_ORKK_WERK_KA02 | Define Cost Elements for WIP Calculation |
Customizing Activity | SIMG_ORKK_WERK_KA02 | Define Cost Elements for WIP Calculation |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_ORKK_WERK_KA02 |
In this step you can check the cost elements under which the work in process and (if applicable) the reserves are updated on the order (product cost collector or (manufacturing order.
These secondary cost elements have cost element type 31 (results analysis for orders/projects). In the step Define Update, assign these results analysis cost elements to the individual line IDs. The value of the line ID is updated on the order under the appropriate results analysis cost element.
If you want to transfer the work in process or reserves for unrealized costs to Financial Accounting, you must define posting rules. Do not define any cost elements in the Controlling component for the G/L accounts in these posting rules, because the order is not credited when the work in process is settled.
Reports are defined in the information system that display the data from results analysis under the results analysis cost elements. Order hierarchies can be used to display this data at higher levels, such as at plant level.
Requirements
You must already have completely created a controlling area.
Standard settings
The standard system provides a number of predefined results analysis cost elements.
Further notes
- Check whether the cost elements provided with the standard system meet your requirements.
- If necessary, create new cost elements of cost element type 31 (results analysis for projects/orders).
Transports
For transporting cost elements, a special function is provided in the Implementation Guide for Controlling General.
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_ORKK_WERK_KA02 | 0 | HLA0009426 | Product Cost by Order |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
KA01 | T - Individual transaction object | KA02 | ORKK9 | Change Cost Element | ||
KA01 | T - Individual transaction object | KA03 | ORKK10 | Display Cost Element | ||
KA01 | T - Individual transaction object | KA06 | ORKK8 | Create Cost Element |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |