IMG Activity
ID | SIMG_ORKK_KUPPEL_UR | Define Source Structure |
Transaction Code | S_ALR_87008213 | IMG Activity: SIMG_ORKK_KUPPEL_UR |
Created on | 19981222 | |
Customizing Attributes | SIMG_ORKK_KUPPEL_UR | Define Source Structure |
Customizing Activity | SIMG_ORKK_KUPPEL_UR | Define Source Structure |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_ORKK_KUPPEL_UR |
Note on Costing
You only need a source structure for costing joint products if you want to distribute the costs to the joint products using cost elements.
If you do not want to distribute the costs using cost elements, the costs will be distributed on the basis of the apportionment structure in the material master record. In this case you do not have to carry out this step.
Source structure
In this IMG activity, you define the source structures used when settling and costing joint products.
A source structure contains several source assignments, each of which contains the individual cost elements or cost element intervals to be settled using the same distribution rules.
In the settlement rule for the sender you can define one distribution rule, in which you specify the distribution and receivers for the costs for each source assignment.
Example
The object in question has incurred both direct and overhead costs. The direct costs are to be divided 50% each between a fixed asset and a cost center, while the overhead is to be settled in full to an administration cost center in CO.
To do this, you would create a source structure with two source assignments:
- Direct cost elements
- Overhead cost elements
Activities
Check whether you need to use source structures in your settlement procedures. If you are settling to cost elements, you do not need a source structure. Otherwise, create a source structure as follows:
- Choose New entries, then enter a key and an explanatory text.
- Choose assignments.
- Choose source data and if requested, set the controlling area.
- Choose New entries and store individual cost elements, cost element intervals or cost element groups.
Save your entries.
Further notes
The quantity structure of the material is determined by means of entries in the material master record. If none of these entries exists, the quantity structure is determined by means of the quantity structure determinaton ID specified in the costing variant.
For more information on costing joint products (such as quantity structure determination), see the document CO - Product Cost Planning in the SAP Library.
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_ORKK_KUPPEL_UR | 0 | HLA0001439 | Cost Estimate with Quantity Structure |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_ORIGIN | C - View cluster | OKEU | CO-PC4 | Assignments |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |