SAP ABAP IMG Activity SIMG_ORKAOPIB (Enter Detail Settings for Interest Profile)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KAUC (Package) Customizing R/3 Cost Accounting, Orders
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KAUC (Package) Customizing R/3 Cost Accounting, Orders
IMG Activity
ID | SIMG_ORKAOPIB | Enter Detail Settings for Interest Profile |
Transaction Code | S_ALR_87005031 | IMG Activity: SIMG_ORKAOPIB |
Created on | 19981222 | |
Customizing Attributes | SIMG_ORKAOPIB | Enter Detail Settings for Interest Profile |
Customizing Activity | SIMG_OLPR_OPIB | Enter Detail Settings for Interest Profile |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_ORKAOPIB |
In the interest profile, you can store the following parameters for each interest indicator and currency:
- Conditions for the project interest calculation:
- Time elapsed since the first posting (minimum duration) and from which interest is calculated for the project or internal order
- Threshold value (of the costs accumulated on a project or internal order) as of which interest is calculated on the project/internal order
- Period control for the compound interest calculation
- Depreciation area for the interest base
Activities
Store the rules for the interest calculation.
Further notes
You have the following options for assigning an interest profile to a project:
- As a default value in the Project System Implementation Guide, for:
- The standard project definition
- The project definition
- In the Project System application menu
If no interest profile is stored in the project profile, you can store an interest profile in the control data for:
- Standard project definition
- In the Basic Data menu, choose Standard structures -> Standard WBS -> Change -> Project definition -> Details -> Control.
- Project definition
- In the Operative Structures menu, choose Work breakdown struc -> Change -> Details -> Control.
- The entry is copied into the WBS elements as a default value.
- WBS elements
- In the Operative Structures menu, choose Work breakdown structure -> Single element -> Change -> Details -> Control.
You can assign an interest profile to an internal order in one of the following ways:
- In the model order:
To do this, choose Maintain interest profile in model orders.
- In the master data of the relevant internal order:
To do this, go to the Internal Orders menu and choose Master data -> Order -> Change.
Further notes
The planned interest calculation takes no account of the minimum duration and threshold value specifications.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 1 | Mandatory activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_ORKAOPIB | 0 | HLA0001407 | Periodic Order Closing |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_TPI02 | V - View | OPIB | 01 | Maintain Interest Profile |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |