Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KAUC (Package) Customizing R/3 Cost Accounting, Orders
IMG Activity
ID | SIMG_ORKAKTPF_ZUORDN | Assign Template |
Transaction Code | S_ALR_87004949 | IMG Activity: SIMG_ORKAKTPF_ZUORDN |
Created on | 19981222 | |
Customizing Attributes | SIMG_ORKAKTPF_ZUORDN | Assign Process Templates |
Customizing Activity | SIMG_ORKAKTPF_ZUORDN | Assign Process Templates |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_ORKAKTPF_ZUORDN |
In this IMG step you maintain the assignments for your templates. for cost objects and calculations.
As templates are not dependent on materials or orders, you must select the appropriate template at the time of evaluation. This selection must meet the following assignment logic:
- For product cost planning:
- Select an overhead structure through the valuation variant, which is selected through the costing variant.
- Select the overhead key through the overhead group in the master record for the material to be costed.
- The R/3 System determines the environment based on the method of costing (unit or product costing).
- For cost object costing and cost object allocations:
- The R/3 System selects the overhead structure and the overhead key from the master record for the cost object, and determines the environment based on the cost object.
- For material transfer from PP:
- You can assign the template using the overhead key or the product group and overhead key. The R/3 System always uses SOP as the environment.
Requirements
Create the environment and the template. Additionally, you must maintain the assignment criteria described above in the corresponding objects
Recommendation
To call up assignment maintenance using the maintenance transaction for the template, choose "Environment".
Activities
Enter the controlling area, costing sheet, overhead key and environment.
Further notes
For more information, see the Application help: "AC - Financials -> CO - Controlling -> Activity-Based Costing -> Business Process planning -> Period-Based Allocations -> Template Allocation in Plan -> Template Allocation for Cost Objects, or Template Allocation in Plan Calculation," or "Period-end Closing Period-Based Allocations -> Template Allocation in Actual -> Template Allocation for Cost Objects.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 1 | Mandatory activity |
Critical / Non-Critical | 1 | Critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_ORKAKTPF_ZUORDN | 0 | HLA0009441 A HLA0001407 O HLA0009441 A HLA0001484 |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_COTPLF | V - View | KTPF | OPA-ZUORDN | Assign Template |
History
Last changed by/on | SAP | 19990507 |
SAP Release Created in |