SAP ABAP IMG Activity SIMG_CFMENUOLPFKZA1 (Define Overhead Rates)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-SFC-PLN (Application Component) Order Planning
     CO0C (Package) Application Development ERP Customizing Orders
IMG Activity
ID SIMG_CFMENUOLPFKZA1 Define Overhead Rates  
Transaction Code S_ALR_87003827   IMG Activity: SIMG_CFMENUOLPFKZA1 
Created on 19981222    
Customizing Attributes SIMG_CFMENUOLPFKZA1   Define Overhead Rates 
Customizing Activity SIMG_CFMENUOLPFKZA1   Define Overhead Rates 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUOLPFKZA1    

This section tells you how to define all the parameters which determine the calculation of overhead rates for cost centers (including activity types), business processes, orders, projects, products and such like.

Overhead rates are used to pass on costs to cost centers that do not directly reference the activity used. Thus you can, for example, distribute the costs from a warehouse cost center to orders for which material was taken from the relevant warehouse.

Overhead costing differs from internal activity allocation in that you cannot express cost center output in quantities. Instead, the costs for the cost center are passed on via overhead rates to the cost centers (including activity types), orders, projects products, and so on.

The tracing factor for the overhead costing can be either the amount of particular direct costs (such as direct material costs for a production order) or a total of direct costs and overhead cost of goods manufactured.

You can also calculate percentage or quantity-based overhead rates, which lead to an actual credit being posted to a cost center and a debit to the order, project etc.

You can use this function to calculate both plan and actual overhead, rates, and overhead rates for commitments (business processes do not use commitments).

  • Plan overhead rates are determined as part of cost center planning, business process planning, order planning, preliminary costing, project planning, product costing or unit costing.
  • Actual overhead rates and commitment overhead rates are calculated as part of period-end closing based on the actual costs incurred or the commitments set up.

The parameters for overhead costing are summarized in a costing sheet. Overhead costing is only carried out for objects, for which a costing sheet is maintained. (See IMG activity Define Costing Sheet)

  • For cost centers, you enter the costing sheet in the master data of the cost center.
  • For business processes, you enter the costing sheet in the master data of the business processes.
    • For internal orders and production orders without quantity structures, the costing sheet can be referenced from a model order.
    • For production orders, process orders, product cost collectors, maintenance orders, maintenance orders and service orders, you default the costing sheet using a valuation variant.
  • For projects, you enter the costing sheet in the project profile.
  • For products, you select the costing sheet using the valuation variant.
  • For Cost object-ID numbers you default the costing sheet using the cost object profile.
  • For sales document items, you default it using the requirements class.

Standard Settings

The standard SAP system contains various costing sheets, which you can use as reference models for defining your own costing sheets.

To work with these costing sheets, you need to:

  • Ensure that all the relevant cost elements are in the calculation bases
  • Check the conditions for overhead calculation
  • Include the cost centers or overhead cost orders for your company in the credit keys
  • Ensure that the costing sheet is defaulted in master data maintenance

If the preconfigured calculation bases, overhead rates and credits are not enough for your requirements, you can create new ones or change the existing ones.

The SAP standard system contains the following costing sheets:

  • A00000 Standard

    You can use this costing sheet to determine material, production, administration and sales overhead. The conditions in the sheet are controlling area-dependent. In this sheet, you can determine plan, actual and commitment overhead.

  • A00001 Standard 1/overhead key

    You can use this costing sheet to determine material, production, administration and sales overhead. The conditions for the overhead determination are dependent on the overhead keys you enter in the orders, projects and so on. This means that you can create separate keys for each project or for particular products or orders. You can determine plan or actual overhead.

  • A00002 Standard 2/Plant

    You can use this costing sheet to determine material, production, administration and sales overhead. The conditions in the sheet depend on the plant. You can determine plan or actual overhead and can use this sheet as the base for entering different overhead conditions for each plant in your business.

  • A00003 Standard 3/Company code

    You can use this costing sheet to determine material, production, administration and sales overhead. The conditions in the sheet depend on the company code. You can determine plan or actual overhead and can use this sheet as the base for entering different overhead conditions for each company code in your business.

  • A00004 Standard 4/Business area

    You can use this costing sheet to determine material, production, administration and sales overhead. The conditions in the sheet depend on the business area. You can determine plan or actual overhead and can use this sheet as the base for entering different overhead conditions for each business area in your business.

  • A00005 Standard 5/Order type

    You can use this costing sheet to determine material, production, administration and sales overhead. The conditions in the sheet depend on the order type. You can determine plan or actual overhead and can use this sheet as the base for calculating overhead dependent on the purpose of the order (capital investment measure, production order, service order).

  • A00006 Standard 6/Order category

    You can use this costing sheet to determine material, production, administration and sales overhead. The conditions in the sheet depend on the order category. You can determine plan or actual overhead and can use this sheet as the base for calculating overhead in orders, to make overhead conditions dependent on the technical character of the order (PP order, PM order etc.).

  • PP-PC1 PP-PC Standard

    You can use this costing sheet to determine material and production overhead. This sheet is usually used to determine the production costs for a product. The conditions in the sheet depend on the controlling area. You can determine plan, actual and commitment overhead.

  • PP-PC2 PP-PC Overheads on cost of goods manufactured

    You can use this costing sheet to determine material, production, administration and sales overhead. This sheet is usually used to determine the cost of goods sold for a product. The conditions in the sheet depend on the controlling area. You can determine plan, actual and commitment overhead.

Actions

Define your overhead surcharges.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUOLPFKZA1 0 HLA0006242 O HLA0009426  
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
KZA1 T - Individual transaction object KZA1 01 Select Overhead 
History
Last changed by/on SAP  19981222 
SAP Release Created in