SAP ABAP IMG Activity SIMG_CFMENUOLMCMCFA (Change Period Split for On-Time Delivery Performance)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   LO-LIS (Application Component) Logistics Information System (LIS)
     MC0C (Package) Customizing Logistics Information System
IMG Activity
ID SIMG_CFMENUOLMCMCFA Change Period Split for On-Time Delivery Performance  
Transaction Code S_ALR_87000685   IMG Activity: SIMG_CFMENUOLMCMCFA 
Created on 19981222    
Customizing Attributes SIMG_CFMENUOLMCMCFA   Change period split for on-time delivery performance 
Customizing Activity SIMG_CFMENUOLMCMCFA   Change period split for on-time delivery performance 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUOLMCMCFA    

In the Logistics Information System (LIS), the statistics are managed on the amount of schedule variances of vendors.

The delivery date variance is a key figure which specifies in days the difference between the statistically relevant delivery date and the date of the goods receipt.

This key figure is updated during the goods receipt for the entry date.

You can determine four interval limits. Five intervals are then available to you for the valuation.

Example

You have set the interval limits, for example, as follows:

  • 1    -20 days
  • 2    -10 days
  • 3    10 days
  • 4    20 days

You have determined the intervals as follows then:

  • x <= -20 (interval limit 1)
  • -20 < x <= -10 (interval limit 2)
  • -10 < x <= 10 (interval limit 3)
  • 10 < x <= 20 (interval limit 4)
  • x > 20 (interval limit 4)

A goods receipt which arrives, for example, 21 days too early would thus fall into the first interval.

A goods receipt which only arrives 12 days after the planned delivery date would fall into the fourth interval.

Note

The specification of interval limits is useful only if you specify ascending values for the interval limits.

Requirements

You must have created purchasing organizations.

Actions

  1. Determine your work area by selecting and copying a purchasing organization.
  2. If you want to redefine the interval limits for the amount of delivery date variance, choose "New entries".
  3. Enter an interval limit number in field "CurrNo" (current number).

    This number must be between 1 and 4.

  4. Specify (in days) the interval limits for the amount of variance in field "Del.date var." (delivery date variance).

    You can enter four interval limits at the most here which define a maximum of five intervals.

  5. Save your entries.

Business Attributes
ASAP Roadmap ID 207   Establish Reporting 
Mandatory / Optional 1   Mandatory activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUOLMCMCFA 0 HLA0009513 O HLA0006423 O ALR0006032  
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_T147H V - View SM30 0000000001 Grid with On-time Delivery Windows 
History
Last changed by/on SAP  19981222 
SAP Release Created in