Hierarchy
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ INSC (Package) Application Development R/3 Plant Maintenance Customizing
IMG Activity
ID | SIMG_CFMENUOLI0OICB | Set Modification Parameters |
Transaction Code | S_ALR_87000344 | IMG Activity: SIMG_CFMENUOLI0OICB |
Created on | 19981222 | |
Customizing Attributes | SIMG_CFMENUOLI0OICB | Set modification parameters |
Customizing Activity | SIMG_CFMENUOLI0OICB | Set modification parameters |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_CFMENUOLI0OICB |
This step allows you to define the following central settings for your BOMs:
- Activating validity maintenance
If you activate validity maintenance, you then have the option of specifying a "valid from" date when maintaining a BOM. If validity maintenance is not active, BOMs are created with the current date or if necessary with the internal system low date (1.1.1990).
- Activating the low date
If you activate the low date (1.1.1990), this will be proposed as the "valid from" date instead of the current date.
- Activating engineering change management
- If you activate engineering change management, you have the option of making BOM changes with a history in reference to a change number (in other words the state of the BOM before and after the change will be recorded in the system).
If you deactivate engineering change management, you cannot make any changes in the BOM with a historical record.
You only determine in this step whether or not BOM maintenance can be carried out with engineering change management. You specify in the menu option "Determine history requirement for BOMs" whether the use of engineering change management is compulsory in particular cases.
- Size unit for 'piece'
Here you can define a proposed unit of measurement for the BOM header and the BOM items. Remember that the base unit of measure for equipment BOMs and functional location BOMs is always 'piece'.
- Explosion type BOM item
You only use this indicator when you have activated the BOM engineering change management.
- Activating the CAD switch
If you want to maintain BOMs from a CAD system, activate the CAD switch. This switch ensures that an additional field appears in the BOM header and BOM item. This field tells you whether the BOM header or BOM item was maintained from the CAD system.
Note
The modification parameters set here are valid both for material BOMs and equipment BOMs. This is, as a rule, a one-time setting which should not be changed once the system is productive.
Default settings
The following settings are supplied in the standard system:
- validity maintenance and EC management are active
- the current date is proposed
- CAD is active
Recommendation
It is recommended that you use the SAP standard settings.
Activities
Define the central settings for BOMs.
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 1 | Mandatory activity |
Critical / Non-Critical | 1 | Critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_CFMENUOLI0OICB | 0 | HLA0006643 O ALR0000082 |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_TCS03_M | V - View | OICB | 01 | BOM Modification Parameters |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |