SAP ABAP IMG Activity SIMG_CFMENUOLI0OICB (Set Modification Parameters)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     INSC (Package) Application Development R/3 Plant Maintenance Customizing
IMG Activity
ID SIMG_CFMENUOLI0OICB Set Modification Parameters  
Transaction Code S_ALR_87000344   IMG Activity: SIMG_CFMENUOLI0OICB 
Created on 19981222    
Customizing Attributes SIMG_CFMENUOLI0OICB   Set modification parameters 
Customizing Activity SIMG_CFMENUOLI0OICB   Set modification parameters 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUOLI0OICB    

This step allows you to define the following central settings for your BOMs:

  • Activating validity maintenance

    If you activate validity maintenance, you then have the option of specifying a "valid from" date when maintaining a BOM. If validity maintenance is not active, BOMs are created with the current date or if necessary with the internal system low date (1.1.1990).

  • Activating the low date

    If you activate the low date (1.1.1990), this will be proposed as the "valid from" date instead of the current date.

  • Activating engineering change management
  • If you activate engineering change management, you have the option of making BOM changes with a history in reference to a change number (in other words the state of the BOM before and after the change will be recorded in the system).

    If you deactivate engineering change management, you cannot make any changes in the BOM with a historical record.

    You only determine in this step whether or not BOM maintenance can be carried out with engineering change management. You specify in the menu option "Determine history requirement for BOMs" whether the use of engineering change management is compulsory in particular cases.

  • Size unit for 'piece'

    Here you can define a proposed unit of measurement for the BOM header and the BOM items. Remember that the base unit of measure for equipment BOMs and functional location BOMs is always 'piece'.

  • Explosion type BOM item

    You only use this indicator when you have activated the BOM engineering change management.

  • Activating the CAD switch

    If you want to maintain BOMs from a CAD system, activate the CAD switch. This switch ensures that an additional field appears in the BOM header and BOM item. This field tells you whether the BOM header or BOM item was maintained from the CAD system.

Note

The modification parameters set here are valid both for material BOMs and equipment BOMs. This is, as a rule, a one-time setting which should not be changed once the system is productive.

Default settings

The following settings are supplied in the standard system:

  • validity maintenance and EC management are active
  • the current date is proposed
  • CAD is active

Recommendation

It is recommended that you use the SAP standard settings.

Activities

Define the central settings for BOMs.

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 1   Mandatory activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUOLI0OICB 0 HLA0006643 O ALR0000082  
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_TCS03_M V - View OICB 01 BOM Modification Parameters 
History
Last changed by/on SAP  19981222 