SAP ABAP IMG Activity SCPI_POI5 (Choose method for finding planned orders via work centers)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   LO-SCI (Application Component) Supply Chain Planning Interfaces (SCPI)
     MSCI (Package) IMG: Supply-chain planning interfaces
IMG Activity
ID SCPI_POI5 Choose method for finding planned orders via work centers  
Transaction Code     (empty) 
Created on 19981230    
Customizing Attributes SCPI_POI5   Choose method for finding planned orders via work centers 
Customizing Activity SCPI_POI5   Choose method for finding planned orders via work centers 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SCPI_POI5    

In this section you define which method should be used to select the planned orders for the specified work centers.

You must specify this method if you use the production optimization interface.

Standard settings

SAP does not provide any standard method.

Activities

Select a method for selecting planned orders and set the relevant indicator:

  • V: Selection of all materials for which one of the specified work centers is named in a production version. All planned orders are selected for these materials.
  • B: Selection of all capacity requirements that use a capacity of the selected work center. All planned orders are selected for these capacity requirements.
  • P: Selection of all plans for which at least one operation is processed at the specified work center. All materials that can be produced through the selected plans are then selected. All planned orders are then selected for the selected materials.

Further notes

You can only select method V if you are working with production versions. Note also that the relevant planned orders are only selected for the work centers if these work centers are entered in a production version assigned to the material.

You can only select method B if lead time scheduling takes place in the R/3 system. No capacity requirements exist outwith the scheduling horizon and the relevant planned orders cannot be selected.

Method P is the most precise, but also the most time-consuming method.

Before execution, read the document Data transfer parameters for POI.

Business Attributes
ASAP Roadmap ID 255   Create Interfaces 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SCPI_POI5 0 HLA0009816 Production Optimization Interface (POI) 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_TCLOI5 V - View SM30 0000000001 Find Planned Order via Work Centers 
History
Last changed by/on SAP  19981230 
SAP Release Created in