Hierarchy
⤷ PT (Application Component) Personnel Time Management
⤷ PTLP_46C (Package) HR - WFM Core Interface (Release-Independent)
IMG Activity
ID | PT_WFMCORE | Integration with the Workforce Management Core |
Transaction Code | S_AX8_68000386 | IMG Activity: PT_WFMCORE |
Created on | 20030312 | |
Customizing Attributes | PT_WFMCORE | Integration with the Workforce Management Core |
Customizing Activity | PT_WFMCORE | Integration with the Workforce Management Core |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | PT_WFMCORE |
Use
In this activity you establish the following:
- How infotypes and subtypes can be mapped to the time specification types in the WFM Core
- How the work schedule (working times and breaks) is mapped to the time specifications.
Requirements
Standard settings
Activities
You must make the following settings in order to be able to transfer the infotype to the WFM core:
- Enter the HR infotype in the field Infotype.
- Enter the HR subtype in the field Subtype.
- In the field LRP-Time Type for Working Time enter the time specification type from the WFM Core that should be used for availability/non-availability.
- In the field LRP-Time Type for Break Time enter the time specification type from the WFM Core that should be used for the breaks of this infotype.
Make the following settings in the table for transferring the working and break times to the WFM Core:
- In the field Infotype enter the ID for the work schedule PWS.
- In the field Subtype enter the Customizing key for the daily work schedule, e.g. FLEX.
- In the field LRP-Time Type for Working Time enter the time specification type from the WFM Core that should be used for working times.
- In the field LRP-Time Type for Break enter the time specification type from the WFM Core that should be used for breaks.
The following algorithm is used in order to find the valid correspondence for a particular infotype or daily work schedule:
The system first looks for the exact infotype-subtype combination. If no agreement is found, the system checks whether the infotype and the template of the subtype exist. If this is also unsuccessful, the system then searches for the infotype with the subtype space. If this search is not successful, then the time specification type space is used. This should always exist in the WFM Core.
There is also the customer extension PTLRPIF for determining the valid time specification type. The time specification types determined above can be overwritten again in the function modules EXIT_SAPLPTLM_001 and EXIT_SAPLPTLM_002.
Example
An infotype can be transferred to availabilities (e.g. overtime) or non-availabilities (e.g. leave). The WFM time type for breaks then determines how the break description of the relevant infotype should be represented (e.g. breaks taken during overtime ).
Further notes
The report RPTWFMIF allows you to create resources in the WFM Core for any employees.
For these resources you can transfer from the mySAP HR Time Management availability information like working and break times from the work schedule and from the daily work schedule to the WFM Core.
Business Attributes
ASAP Roadmap ID | 262 | Technical and Graphical Settings |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | PT_WFMCORE | 0 | HLA0100354 | Integration with Other Applications |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_PTLRPRC2SP | V - View | SM30 |
History
Last changed by/on | SAP | 20030312 |
SAP Release Created in | 2002_1_46C |