SAP ABAP IMG Activity OHABR_AU014 (Maintain scheme to activate PWR/acquisition period control)
Hierarchy
☛
SAP_HRCBR (Software Component) Sub component SAP_HRCBR of SAP_HR
⤷ PY-BR (Application Component) Brazil
⤷ P37C (Package) Customizing HR Brazil
⤷ PY-BR (Application Component) Brazil
⤷ P37C (Package) Customizing HR Brazil
IMG Activity
ID | OHABR_AU014 | Maintain scheme to activate PWR/acquisition period control |
Transaction Code | S_AHR_61006753 | IMG activity: OHABR_AU014 |
Created on | 19981221 | |
Customizing Attributes | OHABR_AU014 | Maintain scheme to activate PWR/acquisition period control |
Customizing Activity | OHABR_AU014 | Maintain scheme to activate PWR/acquisition period control |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | OHABR_AU014 |
In this section of the Implementation Guide, you bring to use the sub-scheme used to activate control for Paid Weekly Rest (PWR) calculation in time management main scheme.
Example
Requirements
If the generation of the legal leave entitlement is executed via report RPTIME00, it is necessary to execute all the steps of this activity. This means, all the rules and sub-schemes of the sub-scheme BRT1 are relevant.
If the generation of the legal leave entitlement is executed via report HBRUQTG0, only the sub-schemes and rules of sub-scheme DTR0 are relevant. This means rules BRT0, BRT3, BRT4 and BRT5 have to be deactivated.
Standard settings
Recommendation
Activities
- Copy standard scheme TM00 to a new one with a name allowed for customers, for example ZTM0.
- Copy sub-scheme BRT1, as you have done previously, to a sub-scheme with a different name.
- Insert the new sub-scheme copied (ZRT1, for example) in line prior to function call RTIP TR10 of the new scheme (ZTM0) as follows:
- Specify the function COPY in the appropriate column (Fncts) and ZRT1 in the column corresponding to parameter 1 (Par1).
- Save and activate the change.
- Save your changes.
Further notes
For further information on how to copy schemes, please see documentation displayed in the menu option Help --> Application help .
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | I | Valid for countries specified |
Customizing Attributes | Country Key | Country Name |
---|---|---|
OHABR_AU014 | BR | Brazil |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | OHABR_AU014 | 0 | AHR0000056 | Wage Type Valuation |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
PSCC | L - Logical transport object | PE00 | BRT1 01 | Sub-scheme for acquisition period processing | ||
PSCC | L - Logical transport object | PE00 | TM00 BR | Scheme for time evaluation |
History
Last changed by/on | SAP | 19981221 |
SAP Release Created in |