SAP ABAP IMG Activity OALE_HRDST_40 (HR Payroll: Construction Industry)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PA-OS (Application Component) Organizational Structure
     PP0C (Package) Organization and Planning - Customizing
IMG Activity
ID OALE_HRDST_40 HR Payroll: Construction Industry  
Transaction Code S_AHR_61000363   IMG Activity: OALE_HRDST_40 
Created on 19981221    
Customizing Attributes OALE_HRDST_40   HR Payroll: Construction Industry 
Customizing Activity    
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name OALE_HRDST_40    

Construction industry functions as an interface to Accounting (AC) within the HR component Payroll Construction Industry.

The construction site is not created as a object in HR, but has to be created in Accounting (AC). A construction site can be created as:

  • PSP-Element
  • Network
  • Order
  • Cost object
  • Customer order

The construction site will be assigned additional information in HR such as the beginning and end of construction, head of construction, hazardous collective wage rate bracket, and so on.
The construction site can be accessed using the function module RP_GET_BAUSTELLE as an interface.

Example

Requirements

In order to insert the <zh)Payroll Construction Industry component in distributed systems, the following prerequisites must be given:

Construction site

  • If the construction site is created as a PSP element or as an Internal order, a replica of the data can be made using the distribution model. In this case, it is possible to filter according to the company code.
  • If construction sites are created as networks, cost objects or as an order with another order type, AC and HR can only be operated seperately if the construction sites also exist in the HR system. In this case, it is not possible to filter according to company code or controlling area.

The construction sites must therefore exist in both systems (AC and HR). Otherwise it is not possible to offer input help (F4-Help) when selecting a construction site in an input template.

Supported Release Statuses

The AC system and HR system must have Release 4.5A or higher.

Standard settings

Recommendation

Activities

No settings must be made in Customizing.

Further notes

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 3   Nonrequired activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency I   Valid for countries specified 
Customizing Attributes Country Key Country Name
OALE_HRDST_40 DE Germany
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG OALE_HRDST_40 0 HLA0003774 Construction Industry 
Maintenance Objects
Maintenance object type    
History
Last changed by/on SAP  19990122 
SAP Release Created in