SAP ABAP IMG Activity ISHT_MES_CNTRL_KEYS (Define MES Control Keys)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-HT (Application Component) Industry Solution High Tech
⤷ OGDOC (Package) IS-HT Documentation
⤷ IS-HT (Application Component) Industry Solution High Tech
⤷ OGDOC (Package) IS-HT Documentation
IMG Activity
ID | ISHT_MES_CNTRL_KEYS | Define MES Control Keys |
Transaction Code | S_EGG_64000036 | (empty) |
Created on | 20000307 | |
Customizing Attributes | ISHT_MES_CNTRL_KEYS | Define MES Control Keys |
Customizing Activity | ISHT_MES_CNTRL_KEYS | Define MES Control Keys |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | ISHT_MES_CNTRL_KEYS |
In this step you create MES specific control keys. These control keys are used in the SPC Results Recording Call to PP-PI function. The control keys you will create are:
- MES1
- MES2
- MES3
- MES4
- MES5
- MES6
Example
Requirements
Standard settings
Use the following settings for each control key:
- Control Key MES1
- Leave all the checkboxes blank.
- Make sure External Processing is set to Blank (Internally processed operation).
- Set Confirmations to option 3 - Confirmation Not Possible.
- Control Key MES2
- Leave all the checkboxes blank.
- Make sure External Processing is set to Blank (Internally processed operation).
- Set Confirmations to option 1 - Milestone Confirmation (Not PS/PM).
- Control Key MES3
- Select the Insp. char. required checkbox .
- Leave all other checkboxes blank.
- Make sure External Processing is set to Blank (Internally processed operation).
- Set Confirmations to option 1 - Milestone Confirmation (Not PS/PM).
- Control Key MES4
- Select the following checkboxes: Scheduling, Det. Cap. Reqmnts, Insp. char. required, Cost.
- Leave all other checkboxes blank.
- Make sure External Processing is set to Blank (Internally processed operation).
- Set Confirmations to option 1 - Milestone Confirmation (Not PS/PM).
- Control Key MES5
- Select the Insp. char. required checkbox .
- Leave all other checkboxes blank.
- Make sure External Processing is set to Blank (Internally processed operation).
- Set Confirmations to option 3 - Confirmation Not Possible.
- Control Key MES6
- Select the Cost checkbox.
- Leave all other checkboxes blank.
- Make sure External Processing is set to Blank (Internally processed operation).
- Set Confirmations to option 1 - Milestone Confirmation (Not PS/PM).
Recommendation
Activities
For each control key you will:
- Create the control key.
- Set the indicators.
- Save the control key.
Further notes
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 3 | Nonrequired activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | ISHT_MES_CNTRL_KEYS | 0 | /SAPHT/EGG1000004 | Manufacturing Execution System |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_T430 | V - View | OP00 |
History
Last changed by/on | SAP | 20000308 |
SAP Release Created in |