SAP ABAP IMG Activity APOCIF_TCX00V (Assign Components to an Operation Segment)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   CA (Application Component) Cross-Application Components
     CFD (Package) IMG for APO Core Interface
IMG Activity
ID APOCIF_TCX00V Assign Components to an Operation Segment  
Transaction Code S_AXA_22000049   (empty) 
Created on 20030327    
Customizing Attributes APOCIF_TCX00V   Assign Components to an Operation Segment 
Customizing Activity APOCIF_TCX00V   Assign Components to an Operation Segment 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name APOCIF_TCX00V    

Use

The ERP system determines the requirements date of the component using the first operation segment of the assigned operation. In the ERP production order, this is the Start Setup date. For receipt elements (co/by-products), the system adopts the end date of the assigned operation. However, in SAP APO you can assign a component to any desired activity. An assignment to the Setup activity when you are using setup matrices or sequence-dependent setup activities leads to a significant reduction in performance when optimizing the setup time. Also, the components in production are usually only required for the first time at the Start Processing date.

You can use this IMG activity for the integration of production orders to control from which operation segment (Setup, Process, or Teardown) the requirements date of the associated components of an order is determined (that is, to which activity of an operation in SAP APO the components are assigned).

You can avoid a strictly defined assignment to the Setup operation segment, as well as enabling a uniform component assignment in both systems and a significant increase in performance for setup time optimization in SAP APO.

For the integration of the production process model (PPM), this setting determines to which activity of the operation the components are assigned when the PPM is generated.

These settings only relate to requirement elements (reservations) of a production order or of the assigned PPM. They do not relate to the receipt elements or to process orders.

Requirements

In ERP Customizing for scheduling, it is defined that an operation date should be used as the requirements date of the components.

Standard settings

Recommendation

Activities

Double-click the relevant entry and make the required settings.

Further notes

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG APOCIF_TCX00V 0 HLA0009520 Production Planning and Control 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
CFO3 T - Individual transaction object CFO3  
History
Last changed by/on SAP  20031127 
SAP Release Created in