Hierarchy
⤷ IS-U-WA (Application Component) Waste Management
⤷ EEWA (Package) IS-U: Waste Management
IMG Activity
ID | _ISUWAMD_000048 | Define Scheduling for Charge Assessment |
Transaction Code | S_KK4_82001335 | (empty) |
Created on | 20031128 | |
Customizing Attributes | _ISUWAMD_000048 | Define Scheduling for Charge Assessment |
Customizing Activity | _ISUWAMD_000048 | Define Scheduling for Charge Assessment |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | _ISUWAMD_000048 |
Use
In this activity you define controlling elements for determining due dates in the creation of municipal charges notifications.
These settings are used in the standard module ISU_EVENT_R406 for calculating the due dates in FI event R406.
Requirements
Standard settings
SAP does not provide any standard settings.
Activities
Maintain a charge parameter record for all different payment periods (monthly, quarterly, yearly, and so on) of your company.
The following explains the meaning of the individual fields:
- Charge parameter record
Unique key for the charge parameter record
- Portion
Link to the portion from IS-U billing. Note, that the portion can only be linked with a charge parameter record.
- Due date within first period
Here, you define the regular due date for the first period of the charge period. For example, the regular due date for the first period (01.01 - 31.03) of a customer paying on a quarterly basis is February 15. The regular due date is maintained without specifying a year (DDMM).
- Due date within second to twelfth period
Here, you define the regular due date for the subsequent periods.
- Interval days between charge notification delivery date and charge notification date
The charge notification delivery date is the document date of the billing document, which corresponds to the date of the bill creation. You can use this to maintain the number of days required to print and post the charge notification. This interval is normally formed by the duration of the billing run and the duration of the print creation.
- Factory calendar
Here, you can define a factory calendar, which is used to calculate the adjusted days.
- Correct Non-Workday
You use this field to define how to handle a non-workday from the factory calendar.
- Interval for Postal Delivery
The maximum duration taken into account for postal delivery (generally three days). This is used when calculating the due date.
- Due Date Determination Using Number of Days
Here, you specify the number of days to be used when calculating the due date.
- Due Date Determination Using Number of Months
Here, you specify the number of months to be used when calculating the due date.
Example
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 1 | Mandatory activity |
Critical / Non-Critical | 1 | Critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | _ISUWAMD_000048 | 0 | I500000081 | Master Data |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
TEWADUEDATEDET | S - Table (with text table) | SM30 | Definition of Scheduling for Charge Assessment |
History
Last changed by/on | SAP | 20040121 |
SAP Release Created in | 472 |