Hierarchy
⤷ IS-U (Application Component) SAP Utilities
⤷ EE80 (Package) IS-U: Customizing
IMG Activity
ID | _ISUDMISSL_000003 | Define Determination of Sample Lot Devices |
Transaction Code | S_KK4_74000735 | IMG Activity: _ISUDMISSL_000003 |
Created on | 19990816 | |
Customizing Attributes | _ISUDMISSL_000003 | Define Determination of Sample Lot Devices |
Customizing Activity | _ISUDMISSL_000003 | Define Determination of Sample Lot Devices |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | _ISUDMISSL_000003 |
In this activity you define default values for the number of sample devices and spare devices. These values are then displayed in the Draw sample inspection devices function during the sampling procedure. You define the default values in relation to the division of the ot, the number drawings, the certification or internal certification requirement of the lot and the lot size. You can define different default values for devices with electronic registers only.
You can create absolute or percentage default values. When you create a lot via Create lot, you use the field Number of lot devices to be determined as a percentage define whether the absolute or ercentage value is used.
Example
Dv SD CR P E LtSize No.
01 1 1 50 10
01 1 2 50 2
01 1 1 100 20
01 1 2 100 4
01 1 1 500 50
01 1 2 500 10
01 1 1 1000 100
01 1 2 1000 20
01 1 2 X 100 15
01 1 2 X 100 3
- Dv = Division
- EZ = Simple or double sampling procedure
- CR = Type of certification requirement (none/internal/external)
- P = Type of sample device (sample device/spare device)
- E = Meters with electronic registers only
- LtSize = Size of sample lot
- No. = Your default number of sample devices
- Via Determine lot devices, you have allocated up to 50 devices to a sample lot with division 01. The lot is subject to external certification (CR = 1). Its master data record allows two drawings (BP=1). If you choose Draw sample devices, the fields will contain the values No. = 10 and No. = 2 for both the first and second drawings.
- If you allocate between 51 and 100 devices to the lot, 20 sample devices and 4 spare devices are proposed when you draw devices.
- If you allocate between 101 and 500 devices to the lot, 50 sample devices and 10 spare sample devices are proposed.
- If you allocate 1000 devices to the lot, 100 sample devices are proposed. If you allocate 1500 devices, 0 devices are proposed because the output table does not contain an entry greater than or equal to 1500.
- If you use lots containing devices with electronic registers only and select the Meters with electronic registers only field when you create the lot, 15 sample devices and 3 spare sample devices are proposed, as long as the lot size is less than or equal to 100.
Requirements
To define the division, choose Enterprise Structure -> Definition -> Logistics - General -> Define, Copy, Delete, Check Division
Recommendation
See the field help and the possible entries for the following fields:
- Single sample drawing
- Type of certification requirement
- Type of sample device
- Number of sample devices
Activities
- Choose New entries.
- Define the number of sample devices and spare sample devices for differet lot sizes.
Further notes
- The sum of sample devices and spare sample device from the first drawing should be under 50% of the devices included in the lot. If not, the system will display a warning message. For the examples above, you should define default values that do not exceed the lower limit of 50% of the lot devices (25 devices). One possibility would be to define 10 sample devices and a maximum of 2 spare sample devices. This would result in the sum of 2 drawings * (10+2)=24, which would be in a permissible range.
- Before every first drawing, you must decide whether you want to perform a single or double drawing.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 1 | Mandatory activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | _ISUDMISSL_000003 | 0 | I110004834 | Sampling Procedure |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
TE025A | S - Table (with text table) | SM30 | 0000000000 | Define Determination of Sample Lot Devices |
History
Last changed by/on | SAP | 19990816 |
SAP Release Created in |