Hierarchy
⤷ IS-U (Application Component) SAP Utilities
⤷ EE80 (Package) IS-U: Customizing
IMG Activity
ID | _ISUBIBDRS_000064 | Calculation to the Day for Aperiodic Changes |
Transaction Code | S_SK4_99000005 | (empty) |
Created on | 20000224 | |
Customizing Attributes | _ISUBIBDRS_000064 | Calculation to the Day for Aperiodic Changes |
Customizing Activity |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | _ISUBIBDRS_000064 |
Calculation to the day in the case of aperiodic changes controls how schema steps and values are processed if they are added to or omitted from the billing period.
The system supports three procedures. Note that the time portions to the day are calculated in much the same way as processing to the day in the case of move-in/out:
- Procedure 1
- Calculation of month-based time portions if a schema step deviates from the billing period, but still falls within the interval in the portion.
- Calculation of time portions to the day if a schema step falls outside the interval.
Example 1 for procedure 1
Interval = 27 to 35 days
!------------------Billing period-----------------------!
!-------------------Schema step 1-----------------------!
1/10 32 days 2/10
!---------------Schema step 2---------------------!
1/12 29 days 2/9
Time portion for values of schema step 2 = one month
Example 2 for procedure 1
With prorations (due to VAT change, for example)
!------------------Billing period-----------------------!
!-------------------Schema step 1---!-------------------!
1/10 22 days 2/1 10 days 2/10
!---------------Schema step 2---!-----------------!
1/12 20 days 2/1 9 days 2/9
!---------Schema step 3---!-------------------!
1/16 16 days 2/1 10 days 2/10
===> time portions for partial periods = 22/32 month and 10/32 month
===> time portions for partial periods = 20/29 month 9/29 month
===> time portions for partial periods = 16/30 month 10/30 month with reference to the standard month = 30 days
- Procedure 2
- Calculation of month-based time portions if a schema step corresponds exactly to the billing period and falls within the interval in the portion.
- Calculation of time portions to the day if a schema step deviates from the billing period or the billing period does not fall within the interval.
Example for procedure 2
Interval = 27 to 35 days
With prorations (due to VAT change, for example)
!------------------Billing period-----------------------!
!-------------------Schema step 1---!-------------------!
1/10 22 days 2/1 10 days 2/10
!---------------Schema step 2---!-----------------!
1/12 20 days 2/1 9 days 2/9
!---------Schema step 3---!-------------------!
1/16 16 days 2/1 10 days 2/10
- Procedure 3
- Calculation of month-based time portions if a logical value of a schema step falls within the interval.
- Calculation of time portions to the day if a logical value falls outside the interval.
A logical value could, for example, be a device in a rental price variant (such as SETTLE01 variant). In contrast to the other two procedures, the decision whether month-based billing is to be executed is based on the billing days of the logical value, not on the length of the schema step. The procedure also affects the billing of reference values. This is because several logical values come into question at the same time only during billing of device rental prices and reference values.
Other values - such as factors, quantities, demand and prices - must cover the complete schema step period in the variants where they are used. Values such as these are processed in schema steps with procedure 3, in the same way as if the schema step had procedure 1.
Interval = 27 to 35 days in the following examples for procedure 3
Example 1 for procedure 3
With device rental price
!-----------------------Device 1---------------------------!
1/10 32 days 2/10
!--------------------Device 2-------------------------!
1/12 29 days 2/9
Example 2 for procedure 3
With device rental price
!------------------------Device 1---------------------------!
1/10 32 days 2/10
!---------------Device 2----------------!
1/20 22 days 2/10
Time portion for device 2 = 22/30 month (standard month = 30 days)
Example 3 for procedure 3
With device rental price and proration (due to change in tax, for example)
!------------------------Device 1---!-----------------------!
1/10 22 days 2/1 10 days 2/10
!--------------------Device 2---!-----------------------!
1/12 20 days 2/1 10 days 2/10
Time portions for device 2 = 20/30 month and 10/30 month
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 1 | Critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | _ISUBIBDRS_000064 | 0 | I110004842 | Rate Structure |
Maintenance Objects
Maintenance object type |
History
Last changed by/on | SAP | 20000224 |
SAP Release Created in |