SAP ABAP Class CL_MAT_MATERPSUPPLNGCHGRC (Generated test implementation)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
LO-MD-MM (Application Component) Material Master
⤷
PLM_SE_MAT_XI_PROXY (Package) Package for Proxy Generation Material Master Services
![](/abap/icon/s_instal.gif)
⤷
![](/abap/icon/s_b_tree.gif)
⤷
![](/abap/icon/s_pckstd.gif)
Meta Relationship - Using
# | Relationship type | Using | Short Description | Created on |
---|---|---|---|---|
1 | Interface implementation (CLASS c. INTERFACES i_ref) | II_MAT_MATERPSUPPLNGCHGGLBL | Global Interface | 20090624 |
2 | Interface implementation (CLASS c. INTERFACES i_ref) | II_MAT_MATERPSUPPLNGCHGRC | MaterialERPSupplyPlanningSpecificationChangeRequestConfirmat | 20090211 |
Properties
Class | CL_MAT_MATERPSUPPLNGCHGRC | |
Short Description | Generated test implementation | |
Super Class | ||
Instantiability of a Class | 2 | Public |
Final |
General Data
Message Class | ||
Program status | P | SAP Standard Production Program |
Category | 0 | |
Package | PLM_SE_MAT_XI_PROXY | Package for Proxy Generation Material Master Services |
Created | 20090211 | SAP |
Last change | 20100310 | SAP |
Shared Memory-enabled | ||
Fixed point arithmetic | ||
Unicode checks active |
Forward declarations
# | Type group / Object type | Type | Type Description |
---|---|---|---|
1 | ![]() |
Type group use (TYPE-POOLS tp) | Type group use (TYPE-POOLS tp) |
Interfaces
# | Interface | Abstract | Final | Description | Created on |
---|---|---|---|---|---|
1 | II_MAT_MATERPSUPPLNGCHGGLBL | Global Interface | 20090624 | ||
2 | II_MAT_MATERPSUPPLNGCHGRC | MaterialERPSupplyPlanningSpecificationChangeRequestConfirmat | 20090211 |
Friends
Class CL_MAT_MATERPSUPPLNGCHGRC has no friend class.
Attributes
Class CL_MAT_MATERPSUPPLNGCHGRC has no attribute.
Methods
# | Method | Level | Visibility | Method type | Description | Created on |
---|---|---|---|---|---|---|
1 | ![]() |
Instance method | Public | Constructor | 20090303 | |
2 | ![]() |
Instance method | Public | Method | Finalizing steps after request processing | 20090304 |
3 | ![]() |
Instance method | Public | Method | Preparatory steps for request processing | 20090304 |
Events
Class CL_MAT_MATERPSUPPLNGCHGRC has no event.
Types
Class CL_MAT_MATERPSUPPLNGCHGRC has no local type.
Method Signatures
Method CONSTRUCTOR Signature
Method CONSTRUCTOR on class CL_MAT_MATERPSUPPLNGCHGRC has no parameter.
Method CONSTRUCTOR on class CL_MAT_MATERPSUPPLNGCHGRC has no exception.
Method FINALIZE Signature
# | Type | Parameter | Pass Value | Optional | Typing Method | Associated Type | Default value | Description | Created on |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
CS_OUTPUT | Call by reference | Type reference (TYPE) | MAT_MATERIAL_ERPSUPPLY_PLANNI2 | MaterialERPSupplyPlanningSpecificationChangeConfirmationMess | 20090304 |
Method FINALIZE on class CL_MAT_MATERPSUPPLNGCHGRC has no exception.
Method PREPARE Signature
# | Type | Parameter | Pass Value | Optional | Typing Method | Associated Type | Default value | Description | Created on |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
ES_OUTPUT | Call by reference | Type reference (TYPE) | MAT_MATERIAL_ERPSUPPLY_PLANNI2 | MaterialERPSupplyPlanningSpecificationChangeConfirmationMess | 20090304 | ||
2 | ![]() |
EV_IS_PROCESSED | Call by reference | Type reference (TYPE) | ABAP_BOOL | 20090304 | |||
3 | ![]() |
IS_INPUT | Call by reference | Type reference (TYPE) | MAT_MATERIAL_ERPSUPPLY_PLANNI3 | MaterialERPSupplyPlanningSpecificationChangeRequestMessage_s | 20090304 |
Method PREPARE on class CL_MAT_MATERPSUPPLNGCHGRC has no exception.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 605 |