SAP ABAP Message Class AG Message Number 001 (Check the settings for checking group &1 and checking rule &2)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-BF (Application Component) Basic Functions
     ATPG (Package) From APO Interfaces bapi_apotp_check
Attribute
Message class AG  
Short Description Messages: ATP Server    
Message Number 001  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20130531   
Message Text
Check the settings for checking group &1 and checking rule &2
Help Document

Diagnosis

The system could not determine any checking rules / a valid checking group for the availability check.

System Response

In order to perform the dynamic availability check, the following two parameters need to be maintained in the system:

  • Checking rule in Customizing
  • Checking rule in material master

The checking rule controls which requirements and receipts elements are used when the availability check is performed and whether the replenishment lead time is to be considered in the chack or not. You can use the various checking rules to define different rules for the availability check in the business applications (Sales and Distribution, Material Requirements Planning, Production Order Management, Inventory Management). The checking rules of the individual applications are assigned to the checking groups in Customizing. If an availability check is to be carried out for a material, then the required checking group is assigned to the material in the material master record. The system uses the checking group to find the valid checking rule(s) for each application.

Procedure

Proceed as follows:

  1. In Customizing for Material Requirements Planning (or Sales and Distribution, Production Order Management, Inventory Management), check to see whether the cheking rule has been assigned plant-specifically or MRP-group-specifically. (In Customizing for Material Requirements Planning you can find the checking rule under: Procurement Proposals -> Planned Orders -> Define availability check for components
  2. Assign a checking rule as required to the corresponding plant or to the MRP group used to plan the material.

Note

You can find more information about the availability check in Material Requirements Planning in the IMG chapter: "Define availability check for components".

  1. Check to see whether a checking group has been entered for the component in the material master record (MRP screen 2 or sales/plant screen, Availability check field).
    Maintain a checking group if necessary.

    If you do not wish to perform an availability check, assign the checking group "No availability check" in the material master record.

History
Last changed on/by 20130531  SAP 
SAP Release Created in